been busy in the shed the last few weeks wit a few other on going projects down here and with me haveing exams the last few weeks as well eventually burst on this week at it
first was first today i went and ordered in a few parts i want to do to the engine mainly a new water pump as rbs suffer with heat also decided to change the timing belt as and tensioner and idler as i dont know when they were last changed also ordered all new oils for it new gearbox and diff oils 80w90 and valvoline 20w 50 for the engine new spark plugs and a new fuel filter
so on with a bit more work for the cage i robbed nellys old bolt in one from his time attack car and have that half fitted atm need to get a few more extra bars onto it for the harness,s and also a cross bar then pull it all out again and spray it up
also we started on sorting the front hubs ackerman just fixed so far on both and next job is to sort the roll centre aadjusters on each
![]()
forgot to take pictures of the modified arms and hubs and tie rods before i fitted them today but if i have them out again ill take pics also got the dash built up with all the clocks and boost controller etc dont think ill have time to flock it before its first time out but u never know will get pics of this tomorrow
heres a few pics of the front arms fitted wit no set up on them yet only a few rough estimates
camber much
lock much lol
aim now is to have it finished by the 24th for the m1 drifting if i can it might be rough the first day out but hopefully will be running 110% with some luck
hey will you throw a cover over that 350z for me, ha,
coming on nicely
project as had nothing done wit it of late due to work etc but i finished last week and thing will hopefully move on now again as ive gathered a few parts thanks to keven kinnergan fittied all the suspension in the front and got it back on the ground for the first time in months heres a quick pick of the way it looks sitting on the ground
![]()
Lookin good man, ru goin to correct roll centre at the rear as well?