just bolted them together gav, not on the Car yet if that's what ya mean
Didnt take alot of photos through the process because it was a mad dash but
Masked up either side of the Vally so ill get a nice straight finish,


then Flat to the mat laying beads of silicone torquing up bolts, laying another bead to fill the vally, get rid of all the Air pockets in the silicone before it cures, then rip off the masking tape and you get this,
have them inside nice and warm while the Silicone sets,






befor i did that i Was wondering what the offsets where so finally figured out how to measure them and came up with this,

11" overall edge to edge,


150 From one edge to Hub face,


150 From center face to the outer edge,


Bead to bead 10.5, 150-150 = 0

So that works out at a nice 18x10.5 et0

worked out when my 3" lips arrive the fronts will be 18x10 et6
as borris johnson said Very Niceeeee,